ADNEC intends to appoint a qualified Contractor to execute all works associated with the construction of a new connection structure linking the existing Marina Bridge with the Grandstand Building. The works include architectural, Structural and MEP modifications to both existing facilities, as well as the construction of a new horizontal extension that will physically join the two structures